BMS Hardware

Carrington Road, Toowoomba

Reid Consutling Engineers were the Civil, Structural, Geotechnical and Hydraulic design Engineers for this project.

50m wide building comprising 7,000sqm under roof and 7,000sqm of industrial paving.

Reid Consutling Engineers were the Project Managers and Superintendant for the project having prepared all Engineering drawings.

Aspects of work included:

  • Bulk Earthworks design
  • Foundation design
  • Structural steel framing 
  • Reinforced concrete tilt panel wall design
  • Fire hydrant and hose reel design
  • Structural / Reinforced Concrete Retaining designs